Location
Laboratory/Office
Mitsui Link Lab Shinkiba 3
Commercialization of the third building in the Shinkiba area has been decided.
A newly built rental lab facility scheduled to be completed in autumn 2024
※All of the information provided are planned and planned at this stage and may change in the future.
Access
- Address
-
2-3-72, Shinkiba, Koutou-ku, Tokyogooglemap
- Access
- [Tokyo Metro Yurakucho Line, Rinkai Line, JR Keiyo Line]
6-minute walk from Shinkiba Station (planned)
Route map
Appearance photo
※Some of the photos posted are images. It's not the actual one.
Building Overview
- Total rental area
- Approximately 11,000 m2 (approximately 3,300 tsubo) (planned)
- Date of opening
- Fall 2024 (planned)
- Floor height
- 4,500 mm (planned)
- Tentaka
- CH = 2,800 mm (planned)
- Floor load
- 1,000kg/m2 (1st floor)
500kg/m2 (2nd to 6th floors) (planned) - Draft chamber
Acceptance of installation - Allowed
- Water supply and drainage facilities
- Yes,
- City Gas
- Consultation required (Customers are allowed for customer construction)
- Electric capacity
- Single-face 100/200V: 200VA/㎡
Three-phase 200V: 100VA/㎡ - Emergency power generation
- Available (one phase or three phases can be selected.)
- Parking lot
- 15 units
※The information provided is subject to change in future.
Floor plan
A total of 87 sections that can be flexibly accommodated from a minimum of about 110m2 to a maximum of about 2,040m2.
※There is a possibility that the area will change in the future.
1st floor plan
Standard floor plan (small image)
Exclusive Department
Wet lab specifications compatible with BSL2 in all sections that enable full-scale research such as drug discovery and regenerative medicine.
※The photo on this page is an image photo. It's not the actual one.
About common areas
We plan to develop a full range of shared facilities that take advantage of the liberation of the oceanfront, such as cafes, lounges, and conference rooms.
※Some of the photos posted are images. It's not the actual one.